The NNMAEG partnered with Jaynes Corporation for two Design/Build projects for a 144,520 sq. ft, three level parking structure at Technical Area 03 and 140,761 sq. ft, three level parking structure at Technical Area 50 at the Los Alamos National Laboratory. The project will provide a parking garage within safe/secure walking distance to the NSSB/Otowi TA-03 Area and TA-35, TA-50, and TA-55 areas.
Over the past three years, LANL has experienced significant growth in terms of overall staff and contractors. The existing supply of parking, both in surface lots and in parking structures, is not adequate for the increased activity at LANL.
The new parking structure at TA-03 area will provide an additional 467 spaces, which include 435 standard spaces, 6 motorcycle spaces, 11 ADA compliant spaces, 2 ADA Van compliant spaces, 4 HOV spaces, and 9 Electric Vehicle spaces. The new parking structure at TA-50 area will provide an additional 455 spaces, which include 423 standard spaces, 6 motorcycle spaces, 11 ADA compliant spaces, 2 ADA Van compliant spaces, 4 HOV spaces, and 9 Electric Vehicle spaces. Electrical Design included provisions and spare capacity for up to 21 additional future Electric Vehicle spaces for each building.
For TA-03 and TA-50 areas, NNM A&E Group performed Architectural, Civil, Mechanical, and Electrical design for this important project including site investigations, construction documents, construction administration, and sequences of construction for affected site utilities and other equipment. Protection of migratory bird nesting areas was also provided including eliminating light pollution and runoff.
Construction Drawings included Architectural, Civil, Mechanical, and Electrical Site and Floor Plans, Enlarged Areas, Elevations, Details, Diagrams, and Schedules. A Parking Guidance System and Electrical Vehicle Charging Stations were also included.
Construction Administration was provided including design administration, meetings, reviewing submittals, answering requests for information (RFIs), performing periodic site observations, and preparing As-Built Record Drawings.